St. Vincent Refurbishment
Pictures
Click on picture for larger version
Click here for Saba Pictures

The staging
The staging
A rusted out balcony beam
Close-up of the same beam
A vertical column before it is cleaned.
A vertical column with the rust cleaned and bare areas primed. The green is an epoxy primer.
This is a picture of one of the balcony beams after it has been replaced, boxed in and the undercoating for the finish is applied
These are the new supports for the balcony ceiling
This is a picture of the fiber-rock material that is being used to replace the balcony ceilings
This is a balcony ceiling about 90% completed
These are the plates that are used to patch webbing and flanges on the steel. They are green because the are primed before they are applied.
This is a column flange that has been patched
 
This is another column flange patch
This shows a hole through the webbing of a vertical column
This also shows a hole in the webbing of a vertical column.
This is the application of the waterproof base that is applied between the foam and the finish. 
 
 
 
Clarence and company making an inspection.
 Finally the finish has started to go on.
Another photo of the finish starting to go on.
This is the replacement flashing going into place.
 
 
The gutters going up and a sample of the hurricane shutter for the bedroom
Another picture of the shutters.
Look at this the staging has started to come down.
Another picture with the staging down.
 
 
 
The Finished Building